Dears
We have a requirement :
We have a kind of Finished Goods AB0000* which are produced in a process like a bye-product.
We do not have BOM or routing for this material and we do not need that also.
we need to update the Standard Price of these materials from the costing result of another category of Finished Materials XY0000*
i.e. when the price of the material XY0000* is updated through CK40n, same price should be updated in the AB0000* also.
Is there any way to update this automatically (other than MR21 Manual update) ?