Hi
We are using standard production process without material ledger activated. Creating a production order for a FERT and BOM component is a HALB (€100) which is also own produced. At goods issue, €100 is posted into material consumption cost element.
Now I'm exploring the possibility of splitting material consumption amount into more than one cost element, with a distribution rule referring HALB material's costing structure. Not sure if it exists in standard SAP?
milk