Hi Experts,
I understand that SAP calculates SLED based on the DOM and TSL from material master if the SLED/BBD check is active for the plant. But I do not understand why SAP would overwrite the DOM by the goods receipt date and re-calculate the SLED based on the TSL.
I have a business scenario as below.
Manufacturing process order has created a batch. As per the business process (life science), they will put the DOM in the batch and the SLED will be calculated based on the TSL. Why they need to put the DOM is based on their process requirement and at this point the process order is 10 days before they can GR.
Since this is process industry, after 10 days, they will do the GR in the PI sheet and process messages sent through the batch job for CO51.
Now, when I come back to the batch to see the DOM and SLED, I can see the DOM is now changed as the GR date and the SLED is re-calculated based on the TSL to a new SLED value.
This is not acceptable and a serious compliance violation.
Eg data,
Earlier DOM/SLED before GR based on TSL=3 years
DOM=02.02.2015
SLED=02.02.2018
DOM/SLED after GR done on 12.02.2015 with TSL=3 years
DOM 12.02.2015
SLED=12.02.2018
Do you know of any OSS notes related to similar issues? Or, have anyone faced similar GAPs and how did you address it?
thanks & Rgds,
Jules